濟南注塑加工廠家在注塑加工時要注意一些常見的問題,需要提前做好了解,然后做好預(yù)防措施,這樣下一步才能順利進行。下面我們來分析一下有關(guān)的問題。
Jinan injection molding manufacturers should pay attention to some common problems during injection molding. They need to understand them in advance, and then take preventive measures, so that the next step can be carried out smoothly. Let's analyze the relevant problems.
因為在接受模具的過程中總是存在一定的風(fēng)險,所以對于任何可以想到的和可能出現(xiàn)的情況,都要提前進行風(fēng)險評估。
Because there are always certain risks in the process of accepting the mold, risk assessment should be carried out in advance for any conceivable and possible situation.
著重要放在模具的復(fù)雜程度,零件的關(guān)鍵特性,零件的后加工質(zhì)量以及模具移動過程中任何可預(yù)見的事故。
The importance lies in the complexity of the mold, the key characteristics of the parts, the post-processing quality of the parts and any foreseeable accidents during the movement of the mold.
如果評估后發(fā)現(xiàn)風(fēng)險系數(shù)較高,在收貨前應(yīng)做更詳細的搬家前準(zhǔn)備。收貨后要盡量避免模具損壞的發(fā)生,導(dǎo)致停產(chǎn),對注塑企業(yè)的經(jīng)營造成負(fù)面影響。
If the risk coefficient is found to be high after assessment, more detailed preparations should be made before receiving the goods. After receiving the goods, we should try our best to avoid the occurrence of mold damage, resulting in production stoppage and negative impact on the operation of injection molding enterprises.
廠家建議觀察一組模具的運行情況,包括檢查模具型腔狀況、周期時間、成型工藝條件,其中四個不可思議點為評價值。如果模具不起作用,尤其是模具長期不用,在模具準(zhǔn)備轉(zhuǎn)移之前,需要進行試加工,以評估模具的使用價值。
The manufacturer suggests observing the operation of a group of molds, including checking the mold cavity condition, cycle time and molding process conditions, of which four inconceivable points are evaluation values. If the mold does not work, especially if the mold is not used for a long time, trial processing is required to evaluate the use value of the mold before the mold is ready to be transferred.
濟南注塑加工
剩下的標(biāo)本能知道的盡量多,但不可能知道更多細節(jié)。實際的生產(chǎn)過程條件可能是未知的,或者修改的過程參數(shù)可能是未知的。周期時間無法外推,特殊輔助設(shè)備可能不會引起注意。
The remaining specimens can know as much as possible, but it is impossible to know more details. The actual production process conditions may be unknown, or the modified process parameters may be unknown. The cycle time cannot be extrapolated, and special auxiliary equipment may not attract attention.
如果模具在加工一個零件時只使用模具中的部分型腔,而不是注射整個型腔時模具的運行狀態(tài),那么發(fā)給客戶的各種數(shù)據(jù)的加工參數(shù)當(dāng)然是有問題的。
If the mold only uses part of the cavity in the mold when processing a part, rather than the operating state of the mold when injecting the whole cavity, the processing parameters of various data sent to the customer are certainly problematic.
在賣方交付模具前,注塑機應(yīng)在全注射狀態(tài)下進行測試,以檢查模具的每個產(chǎn)品的質(zhì)量。就是這樣。如果不重視存在的問題,會影響注射產(chǎn)品的質(zhì)量,造成損失。更多相關(guān)事項就來我們網(wǎng)站http://m.mblcredit.com咨詢吧!
Before the seller delivers the mold, the injection molding machine shall be tested in the full injection state to check the quality of each product of the mold. this is it. If we do not pay attention to the existing problems, the quality of injection products will be affected and losses will be caused. More related matters come to our website http://m.mblcredit.com Consult!

相關(guān)產(chǎn)品 / Related products

濟南立強模具有限公司

魯ICP備15002024號-2

網(wǎng)站地圖    TXT    XML 魯公網(wǎng)安備 37010502002026號
平顺县| 湟中县| 天镇县| 隆尧县| 德惠市| 湘潭市| 五寨县| 满洲里市| 阳新县| 顺平县| 磴口县| 湖南省| 商都县| 沾益县| 莲花县| 崇文区| 东源县| 汝州市| 承德市| 武隆县| 璧山县| 乌拉特前旗| 康马县| 曲沃县| 伊吾县| 保德县| 花莲市| 南宁市| 甘泉县| 班玛县| 塔城市| 沧州市| 永胜县| 张家港市| 滦南县| 昌吉市| 乌什县| 纳雍县| 丰都县| 丹寨县| 阜阳市|